1. COMMERTIAL NAME OF HOUSE WIRING MATERIALS AND THEIR SELECTION.
2. HOUSE WIRING PRACTICAL PRACTICE (Connection of Light, Fan, Regulator, TV, Fridge, Combined Switch & Socket etc).
3. TOTAL LOAD CALCULATION PROCEDURE OF A BUILDING.
4. HOUSE WIRING CABLE SPECIFICATION AND SELECTION.
5. INTRODUCTION TO PUSH BUTTON/SWITCHES/ROTARY SWITCHES ETC.
6. INTRODUCTION AND UNDERSTANDING OF SWITCHING CONTACTS- NO/NC TYPES.
7. GARMENTS MULTISTORIED BUILDING, FIRE ALARM CIRCUIT INSTALLATION DIAGRAM PRACTICAL PRACTICE.
8. SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF MAGNETIC CONTACTOR.
9. THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING MAGNETIC CONTACTOR.
10. SPECIFICATION, AMPERE SELECTION & CONNECTION PROCEDURE OF SAFETY THERMAL OVERLOAD FOR MOTOR.
11. THREE PHASE MOTOR PROTECTION CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING THERMAL OVERLOAD.
12. INDUSTRIAL DOL (DIRECT ONLINE) SWITCH PREPARING & CONNECTION PROCEDURE.
13. SPECIFICATION, SELECTION & CONNECTION PROCEDURE OF 3 PH INDUCTION MOTOR.
14. MOTOR CHECKING PROCEDURE PRACTICAL PRACTICE BY USING MULTIMETER.
15. STAR AND DELTA CONNECTION PHYSICAL PRACTICE.
16. SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF MAGNETIC RELAY.
17. LOAD CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING MAGNETIC RELAY.
18. THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING RELAY & MAGNETIC CONTACTOR.
19. INTRODUCTION TO PHASE FAILURE RELAY.
20. INDUSTRIAL THREE PHASE FAILURE RELAY PREPARING & CONNECTION PROCEDURE.
21. MOTOR PROTECTION CIRCUIT PRACTICAL PRACTICE BY USING PHASE FAILURE RELAY.
22. SPECIFICATION, SELECTION & CONNECTION DIAGRAM OF ON DELAY TIMER.
23. LOAD CONTROL CIRCUIT PRACTICAL PRACTICE BY USING ON DELAY TIMER.
24. THREE PHASE MOTOR CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING RELAY, ON DELAY TIMER & MAGNETIC CONTACTOR.
25. FUNCTION AND CONNECTION PROCEDURE OF OFF DELAY TIMER.
26. THREE PHASE MOTOR CONTROL CIRCUIT PRACTICAL PRACTICE BY USING OFF DELAY TIMER & MAGNETIC CONTACTOR.
27. CONNECTION AND SETTING PROCEDURE OF TWIN/SEQUENTIAL TIMER.
28. TRAFFIC SIGNAL CONTROLLING CIRCUIT PRACTICAL PRACTICE BY USING SEQUENTIAL TIMER
29. NAME AND SELECTION PROCEDURE OF VARIOUS INDUSTRIAL METERS.
30. MEASURING PROCEDURE PRACTICAL PRACTICE BY USING MULTIMETER.
31. MEASURING PROCEDURE PRACTICAL PRACTICE BY USING CLAMP ON METER.
32. MEASURING PROCEDURE PRACTICAL PRACTICE BY USING MEGGER TESTER
33. CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING ANALOG VOLTMETER.
34. CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING DIGITAL VOLTMETER WITH PROGRAMMING.
35. CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING ANALOG AMMETER.
36. CONNECTION PROCEDURE PRACTICAL PRACTICE BY USING DIGITAL AMMETER WITH PROGRAMMING.
37. AUTO WATER LEVEL CONTROLLING CIRCUIT PRACTICAL PRACTICE FOR MULTI-STOREYED BUILDING/ INDUSTRY.
38. MANUAL CHANGE OVER SWITCH CONNECTION PROCEDURE PRACTICAL PRACTICE FOR SUPPLYING DUAL POWER OF A MULTI STORED BUILDING.
39. AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE FOR THREE PHASE LOAD AND PRACTICAL PRACTICE WITHOUT TIMER FOR GENERATOR & REB.
40. AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE FOR THREE PHASE LOAD AND PRACTICAL PRACTICE WITH TIMER TO PROTECT REB FROM HUNTING CURRENT (FOR GENERATOR AND REB).
41. BUS BAR COPPER CALCULATION PROCEDURE AND PRACTICAL PRACTICE AS PER VARIATION OF LOAD.
42. SAFETY PANEL SWITCHING CONTROL BY USING LIMIT SENSOR OF POWER PLANT.
43. MODERN PROXIMITY (2 WIRE) SENSOR, SIGNALING METAL DETECTOR CIRCUIT PRACTICAL PRACTIC.
44. MODERN PROXIMITY (3 WIRE) SENSOR, SIGNALING METAL DETECTOR CIRCUIT PRACTICAL PRACTICE.
45. Load Controlling Using various Sensors.
46. PHOTO SENSOR (5 WIRE) CIRCUIT PRACTICAL PRACTICE FOR LIFT.
47. MANUAL FORWARD AND REVERSE CONTROLLING CIRCUIT PRACTICAL PRACTICE FOR THREE PHASE MOTOR.
48. AUTO FORWARD AND REVERSE CONTROLLING CIRCUIT PRACTICAL PRACTICE USING TIMER FOR THREE PHASE MOTOR.
49. STAR DELTA 3 PHASE EASY CONNECTION PROCEDURE FROM MOTOR.
50. STAR DELTA CONTROL CIRCUIT CONNECTION PRACTICAL PRACTICE BY USING TIMER.
51. THREE PHASE MOTOR CONNECTION PROCEDURE USING STAR DELTA CONTROL CIRCUIT PRACTICAL PRACTICE.
52. ELECTRICAL TROUBLE SHOOTING PRACTICAL PRACTICE FROM INDUSTRIAL PANEL BOARD.
53. MPCB (MOTOR PROTECTION CIRCUIT BREAKER) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
54. MMS (MANUAL MOTOR STARTER) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
55. INDUSTRIAL CABLE SELECTION AND CHECKING PROCEDURE.
56. SINGLE LINE DIAGRAM PRACTICE FOR SUB STATION
57. BENEFIT OF USING POWER FACTOR FOR INDUSTRY.
58. ECONOMY POWER FACTOR IMPROVEMENT CAPACITOR SELECTION PROCEDURE.
59. P.F.I (POWER FACTOR IMPROVEMENT PLANT) CONTROL RELAY SELECTION, CONTROLLING AND CONNECTION & PRACTICAL PRACTICE.
60. P.F.I CONTROLLER PROGRAMMING & PARAMETER SELECTION.
61. FAMILIARIZATION WITH INDUSTRIAL DIODE, LED, ZENER DIODE, CHECKING AND PRACTICAL PRACTICE.
62. INTRODUCTION TO INDUCTOR, CAPACITOR & RESISTOR.
63. TC (THERMOCOUPLE) HARDWARE DESCRIPTION & CONNECTION DIAGRAM.
64. TEMPERATURE CONTROLLER CONNECTION PROCEDURE PRACTICAL PRACTICE WITH PROGRAMMING AND TROUBLE SHOOTING.
VFD/ FREQUENCY INVERTER PROGRAMMING, CONNECTION, MOTOR RUN, TROUBLESHOOTING
(3 Brands: Siemens, Mitsubishi, Delta)
1. Working Procedure & Benefits of Using VFD.
2. VFD HARDWARE DESCRIPTION
3. PRACTICAL CONNECTION OF MOTOR WITH INVERTER
4. INTRODUCTION TO VFD EXTERNAL MODE
5. VFD EXTERNAL MODE WIRING PRACTICAL PRACTICE
6. VFD OPERATION MODE SELECTION
7. VFD PARAMETER SETTING
8. VFD FAULT FINDING AND TROUBLE SHOOTING
PLC PROGRAMMING, CONNECTION & TROUBLESHOOTING
(3 Brands: Mitsubishi, Siemens, Delta)
1. INTRODUCTION TO PLC.
2. DISCUSS ABOUT PLC INPUT ELEMENT
3. DISCUSS ABOUT PLC OUTPUT ELEMENT
4. DISCUSS ABOUT PLC INPUT MODULE / OUTPUT MODULE
5. DISCUSS ABOUT PLC ADDRESSING.
6. FAMILIARIZATION WITH VARIOUS PLC LANGUAGES
7. BLOCK DIAGRAM OF PLC.
8. FAMILIARIZATION WITH VARIOUS LADDER SYMBOL
9. CONCEPT AND CONVERSION FROM ELECTRICAL DIAGRAM TO LADDER DIAGRAM
10. BASIC CONCEPT OF PLC SOFTWARE & DATA CABLE
11. OVERVIEW AND INSTALLATION OF VARIOUS PLC SOFTWARES
12. LOAD CONTROLLING WITHOUT LATCHING PRACTICAL PRACTICE
13. LOAD CONTROLLING WITH LATCHING PRACTICAL PRACTICE
14. FAMILIARIZATION WITH INTERNAL AUXILIARY RELAY IN PLC
15. COMPARISON BETWEEN GENERAL AUXILIARY RELAY AND BATTERY BACKED AUXILIARY RELAY
16. FAMILIARIZATION WITH DIFFERENT TYPE OF INTERNAL TIMERS IN PLC.
17. COUNTING SYSTEM AND LOGIC OF INTERNAL ON DELAY TIMERS IN PLC.
18. DIFFERENCE BETWEEN NORMAL TIMERS AND RETENTIVE TIMERS.
19. ON DELAY TIMER LOGIC PRACTICAL PRACTICE
20. DESIGN OF A COMPLICATED PROJECT USING MULTIPLE TIMERS AS PER REQUIREMENT.
21. DESIGN A TRAFFIC SIGNAL PROJECT USING MULTIPLE TIMERS.
22. FAMILIARIZATION WITH VARIOUS TYPE OF COUNTERS IN PLC.
23. LOAD CONTROLLING PRACTICAL PRACTICE USING COUNTERS
24. STAR-DELTA CIRCUIT PRACTICAL PRACTICE IN PLC.
25. FAMILIARIZATION WITH VARIOUS TYPES OF DATA REGISTERS IN PLC.
26. PROGRAMMING OF DATA REGISTERS COMBINED WITH INCREMENT, DECREMENT & DATA REGISTERS
27. TIMER COMBINED WITH DATA REGISTER PROGRAMMING PRACTICE
28. COUNTERS COMBINED WITH DATA REGISTER PROGRAMMING PRACTICE
29. FAMILIARIZATION WITH COMPARE COMMAND IN PLC.
30. LOAD CONTROLLING USING COMPARE COMMAND PRACTICAL PRACTICE.
31. INTRODUCTION TO “MOV “COMMAND.
32. PROGRAMMING PRACTICE USING MOV COMMAND.
33. PRACTICAL PROJECTS DESIGNING PRACTICE FOLLOWING CLIENTS’ REQUIREMENTS.
34. PLC HARDWARE CONNECTION PRACTICAL PRACTICE.
35. EDITING/READING AND COPYING LADDER FROM PLC USING USB CABLE PRACTICAL PRACTICE.
36. WRITING AND TRANSFERRING LADDER LOGIC TO PLC USING USB CABLE PRACTICAL PRACTICE.
37. PLC TROUBLESHOOTING PROCEDURE WITH LOAD.
38. PLC ONLINE MONITORING AND TROUBLE SHOOTING PRACTICAL PRACTICE.
1. INTRODUCTION TO HMI – UNDERSTANDING WIRING & INSTALLATION
2. INTRODUCTION TO VARIOUS TYPES OF SWITCHES (MOMENTARY, MAINTAINED, SET, RESET ETC.)
3. INTRODUCTION TO HMI DISPLAY ELEMENTS.
4. INTRODUCTION TO NUMERIC DISPLAY FOR DISPLAYING NUMBER, COUNTS OR PRODUCTION & LOAD CONTROLLING PRACTICAL PRACTICE.
5. LOAD CONTROLLING AND TIMER DISPLAY DESIGN IN HMI PRACTICAL PRACTICE.
6. INTRODUCTION TO NUMERIC ENTRY FOR GIVING THE INPUT FROM HMI & LOAD CONTROLLING PRACTICAL PRACTICE.
7. LOAD CONTROLLING AND CHANGING TIME DURATION BY USING NUMERIC ENTRY DESIGN PRACTICAL PRACTICE.
8. INTRODUCTION TO MOVING SIGN & PRACTICAL IMPLEMENTATION
9. DATA TRANSFER PROCESS & TROUBLESHOOTING FROM PC/LAPTOP.
Servo Drive (Single Brand)
PLC Analog Programming (Single Brand)
MODBUS (single brand)
AutoCAD Electrical