DIPLOMA INDUSTRIAL ATTACHMENT COURSE CURRICULUM LUXURY BATCH
BDT 6000
CLASS 3 DAYS PER WEEK
CLASS DURATION: 2 HOURS
DOMESTIC AND INDUSTRIAL AUTOMATION
1.MULTISTORED BUILDING WIRING ELECTRICAL EQUIPMENT NAME, AND DESIGN DISPLAYING FROM PROJECTOR.
2.NATIONAL BUILDING CODE RULES AND BUILDING WIRING PRACTICE WITH USING CHANGE OVER AND PROTECTIVE CIRCUIT BREAKER
3.ESTIMATION RULES OF MULTISTORE BUILDING LOAD CALCULATION AND SELECTION OF CABLES.
4.DOMESTIC CABLE DESIGN, SPECIFICATION AND SELECTION PROCEDURE AS PER MULTISTORED BUILDING REQUIREMENT.
5.INTRODUCTION TO INDUSTRIAL SWITCHES: PUSH BUTTON, SELECTOR, ROTARY, TOGGLE AUTO& MANUAL AND DISPLAYING FROM PROJECTOR.
6.OPERATING AND CONNECTION PROCEDURE OF SWITCHES DISPLAY FROM PROJECTOR.
7.DISPLAYING FIRE ALARM EQUIPMENT FROM PROJECTOR AND PRACTICAL PRACTICE.
8.INDUSTRIAL MOTOR CONTROL MAGNETIC CONTACTOR TYPE, CAPACITY SELECTION, AND INTERNAL WIRING DIAGRAM DISPLAYING FROM PROJECTOR.
9.DIAGRAM PREPARATION AND 3 PHASE LOAD RUN PRACTICE FROM NO/NC PUSH AND MAGNETIC CONTACTOR
10.ADVANTAGE, AVAILABILITY, PERFORMANC PRACTICE FROM DIRECT ONLINE SWITCH
11.ON DELAY TIMING RELAY INTRODUCTION, VOLTAGE SELECTION, TIMING SELECTION AND INTERNAL WIRING REALIZATION FOR MOTOR STAR DELTA RUN.
12.INDUSTRIAL MOTOR DELAY CONTROL CIRCUIT PRACTICAL PRACTICE BY ON DELAY TIMER
13.INDUSTRIAL MAGNETIC RELAY TYPE, VOLTAGE AND AMPERE SELECTION. INTERNAL WIRING IDENTIFICATION, SELECTION AS PER LOAD.
14.MONITORING VARIOUS TYPE OF RELAY FROM PROJECTOR AND LOAD CONTROLLING CIRCUIT PRACTICAL PRACTICE.
15.WHAT IS PHASE DETECTION RELAY, COMMERCIAL TYPE OF PHASE DETECTION RELAY
16.ECONOMY PHASE DETECTION CIRCUIT FABRICATION BY MAGNETIC RELAY.
17.INDUSTRIAL MOTOR ECONOMY PROTECTION PRACTICAL PRACTICE BY PHASE DETECTION CIRCUIT AND EASY REPAIRING PROCEDURE.
18.INDUSTRIAL MOTOR ECONOMY PROTECTION PRACTICAL PRACTICE BY PHASE DETECTION CIRCUIT AND EASY REPAIRING PROCEDURE.
19.BENIFIT OF APPLICATION DELAY OFF TIMING RELAY ON GENERATOR AND FURNACE BOILER IN INDUSTRY.
20.PRACTICAL PRACTICE OF INDUSTRIAL MOTOR DELAY OFF AND TROUBLE SHOOTING.
21.DUEL/SEQUENTIAL TIMER APPLICATION AND INTERNAL WIRING IDENTIFICATION WITH TIME SETTING PROCEDURE.
22.AUTO CONTROL TRAFIC SIGNAL PRACTICAL PRACTICE BY SEQUENTIAL TIMER
23.DOMESTIC WATER TANK AUTO CONTROL BY ELRCTRICAL FLOAT SENSOR PRACTICAL PRACTICE AND ECONOMY CONNECTION PROCEDURE.
24.AUTO TRANSFER SWITCH (ATS) BENIFIT, CONTROLLING PROCEDURE AND PRACTICAL PRACTICE FOR GENERATOR & REB.
25.HUNTING PREVENTION AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE AND PRACTICE BY APPPLICATION WITH TIMER.
26.POWER PLANT OPERATING PANEL OPERATION IN APPLICATION WITH VARIOUS TYPE LIMIT SENSOR.
27.SUPER MARKET AND HIGH-RISE BUILDING METAL DETECTOR MAKING PROCEDURE BY APPLICATION OF PROXIMITY SENSOR
28.HIGH RISE MARKET/BUILDING LIFT CONTROLLING BY USING PHOTO ELECTRIC SWITCH (TRANSMITTER AND RECEIVER) PRACTICAL PRACTICE.
29.INDUSTRIAL MOTOR REVERSE /FORWARD CONNECTION PRACTICAL PRACTICE.
30.LOAD SELECTION, ITEM SELECTION AS PER MOTOR CAPACITY AND PRACTICE STAR-DELTA CONNECTION WITH 3 PHASE MOTOR.
31.WHY SINGLE LINE DIAGRAM MENDATORY FOR SUB STATION, LAY OUT PROCEDURE AND PRACTICE
32.SELECTION OF INDUSTRIAL INDUCTION MOTOR FOR INDUSTRY AS PER INSULATION CLASS, IP PROTECTION, SERVICE FACTOR, TYPE AND FRAME SIZE REALIZATION.
VFD/ FREQUENCY INVERTER PROGRAMMING, CONNECTION, MOTOR RUN, TROUBLESHOOTING (2 BRANDS: MITSUBISHI, Delta)
2. VFD HARDWIRE SELECTION PROCEDURE ACCORDING TO LOAD/MOTOR.
3. CONNECTION PROCEDURE OF A MOTOR TO A VFD DEVICE.
4. FAMILIARIZATION WITH VFD INTERNAL AND EXTERNAL MODE
5. VFD EXTERNAL MODE WIRING ACCORDING TO VFD COMPANY MANUAL PRACTICAL PRACTICE
6. FAMILIARIZATION WITH VFD OPERATION MODE SELECTION FOLLOWING VFD MANUAL.
7. INTRODUCTION TO VFD PARAMETER SETTING ACCORDING TO VFD MANUAL.
8. FAMILIARIAZATION WITH VFD FAULT FINDING AND TROUBLE SHOOTING.
PLC PROGRAMMING, CONNECTION & TROUBLESHOOTING (2 BRANDS: MITSUBISHI, SIEMENS,)
2. DISCUSS ABOUT PLC INPUT ELEMENT
3. DISCUSS ABOUT PLC OUTPUT ELEMENT
4. DISCUSS ABOUT PLC INPUT MODULE / OUTPUT MODULE
5. DISCUSS ABOUT PLC ADDRESSING.
6. FAMILIARIZATION WITH VARIOUS PLC LANGUAGES
7. BLOCK DIAGRAM OF PLC.
8. FAMILIARIZATION WITH VARIOUS LADDER SYMBOL
9. CONCEPT AND CONVERSION FROM ELECTRICAL DIAGRAM TO LADDER DIAGRAM
10. BASIC CONCEPT OF PLC SOFTWARE & DATA CABLE
11. OVERVIEW AND INSTALLATION OF VARIOUS PLC SOFTWARES
12. LOAD CONTROLLING WITHOUT LATCHING PRACTICAL PRACTICE
13. LOAD CONTROLLING WITH LATCHING PRACTICAL PRACTICE
14. FAMILIARIZATION WITH INTERNAL AUXILIARY RELAY IN PLC
15. COMPARISON BETWEEN GENERAL AUXILIARY RELAY AND BATTERY BACKED AUXILIARY RELAY
16. FAMILIARIZATION WITH DIFFERENT TYPE OF INTERNAL TIMERS IN PLC.
17. COUNTING SYSTEM AND LOGIC OF INTERNAL ON DELAY TIMERS IN PLC.
18. DIFFERENCE BETWEEN NORMAL TIMERS AND RETENTIVE TIMERS.
19. ON DELAY TIMER LOGIC PRACTICAL PRACTICE
20. DESIGN OF A COMPLICATED PROJECT USING MULTIPLE TIMERS AS PER REQUIREMENT.
21. DESIGN A TRAFFIC SIGNAL PROJECT USING MULTIPLE TIMERS.
22. FAMILIARIZATION WITH VARIOUS TYPE OF COUNTERS IN PLC.
23. LOAD CONTROLLING PRACTICAL PRACTICE USING COUNTERS
24. STAR-DELTA CIRCUIT PRACTICAL PRACTICE IN PLC.
25. FAMILIARIZATION WITH VARIOUS TYPES OF DATA REGISTERS IN PLC.
26. PROGRAMMING OF DATA REGISTERS COMBINED WITH INCREMENT, DECREMENT & DATA REGISTERS
27. TIMER COMBINED WITH DATA REGISTER PROGRAMMING PRACTICE
28. COUNTERS COMBINED WITH DATA REGISTER PROGRAMMING PRACTICE
29. FAMILIARIZATION WITH COMPARE COMMAND IN PLC.
30. LOAD CONTROLLING USING COMPARE COMMAND PRACTICAL PRACTICE.
31. INTRODUCTION TO “MOV “COMMAND.
32. PROGRAMMING PRACTICE USING MOV COMMAND.
33. PRACTICAL PROJECTS DESIGNING PRACTICE FOLLOWING CLIENTS’ REQUIREMENTS.
34. PLC HARDWARE CONNECTION PRACTICAL PRACTICE.
35. EDITING/READING AND COPYING LADDER FROM PLC USING USB CABLE PRACTICAL PRACTICE.
36. WRITING AND TRANSFERRING LADDER LOGIC TO PLC USING USB CABLE PRACTICAL PRACTICE.
37. PLC TROUBLESHOOTING PROCEDURE WITH LOAD.
38. PLC ONLINE MONITORING AND TROUBLE SHOOTING PRACTICAL PRACTICE.
HUMAN MACHINE INTERFACE (HMI) PROGRAMMING, CONNECTION & LOAD CONTROLLING
2. INTRODUCTION TO VARIOUS TYPES OF SWITCHES (MOMENTARY, MAINTAINED, SET, RESET ETC.)
3. INTRODUCTION TO HMI DISPLAY ELEMENTS.
4. INTRODUCTION TO NUMERIC DISPLAY FOR DISPLAYING NUMBER, COUNTS OR PRODUCTION & LOAD CONTROLLING PRACTICAL PRACTICE.
5. LOAD CONTROLLING AND TIMER DISPLAY DESIGN IN HMI PRACTICAL PRACTICE.
6. INTRODUCTION TO NUMERIC ENTRY FOR GIVING THE INPUT FROM HMI & LOAD CONTROLLING PRACTICAL PRACTICE.
7. LOAD CONTROLLING AND CHANGING TIME DURATION BY USING NUMERIC ENTRY DESIGN PRACTICAL PRACTICE.
8. INTRODUCTION TO MOVING SIGN & PRACTICAL IMPLEMENTATION
9. DATA TRANSFER PROCESS & TROUBLESHOOTING FROM PC/LAPTOP.