DIPLOMA INDUSTRIAL ATTACHMENT COURSE CURRICULUM
ECONOMY BATCH
BDT 3000
CLASS 1 DAY PER WEEK
CLASS DURATION: 1.5 HOURS
DOMESTIC AND INDUSTRIAL AUTOMATION
1.MULTI STORIED BUILDING WIRING ELECTRICAL EQUIPMENT NAME, AND DESIGN DISPLAYING FROM PROJECTOR.
2.NATIONAL BUILDING CODE RULES AND BUILDING WIRING PRACTICE WITH USING CHANGE OVER AND PROTECTIVE CIRCUIT BREAKER
3.FRIDGE, AIR CONDITION, ELECTRIC OVEN, GEYSER CONTROL SWITCH CALCULATION AND CONNECTION PRACTICE.
4.ESTIMATION RULES OF MULTI-STOREY BUILDING LOAD CALCULATION AND SELECTION OF CABLES.
5.DOMESTIC CABLE DESIGN, SPECIFICATION AND SELECTION PROCEDURE AS PER MULTISTORED BUILDING REQUIREMENT.
6.INTRODUCTION TO INDUSTRIAL SWITCHES: PUSH BUTTON, SELECTOR, ROTARY, TOGGLE AUTO& MANUAL AND DISPLAYING FROM PROJECTOR.
7.OPERATING AND CONNECTION PROCEDURE OF SWITCHES DISPLAY FROM PROJECTOR.
8.DISPLAYING FIRE ALARM EQUIPMENT FROM PROJECTOR AND PRACTICAL PRACTICE.
9.INDUSTRIAL MOTOR CONTROL MAGNETIC CONTACTOR TYPE, CAPACITY SELECTION, AND INTERNAL WIRING DIAGRAM DISPLAYING FROM PROJECTOR.
10.DIAGRAM PREPARATION AND 3 PHASE LOAD RUN PRACTICE FROM NO/NC PUSH AND MAGNETIC CONTACTOR.
11.MOTOR CHECKING PROCEDURE PRACTICAL PRACTICE BY USING MULTIMETER AND MEGGER TESTER.
12.ADVANTAGE OF MOTOR STAR-DELTA CONNECTION AND STAR-DELTA CONNECTION PHYSICAL PRACTICE.
13.ON DELAY TIMING RELAY INTRODUCTION, VOLTAGE SELECTION, TIMING SELECTION AND INTERNAL WIRING REALIZATION FOR MOTOR STAR DELTA RUN.
14.INDUSTRIAL MOTOR DELAY CONTROL CIRCUIT PRACTICAL PRACTICE BY ON DELAY TIMER
15.INDUSTRIAL MAGNETIC RELAY TYPE, VOLTAGE AND AMPERE SELECTION. INTERNAL WIRING IDENTIFICATION, SELECTION AS PER LOAD.
16.MONITORING VARIOUS TYPE OF RELAY FROM PROJECTOR AND LOAD CONTROLLING CIRCUIT PRACTICAL PRACTICE.
17.BENEFIT OF APPLICATION DELAY OFF TIMING RELAY ON GENERATOR AND FURNACE BOILER IN INDUSTRY.
18.PRACTICAL PRACTICE OF INDUSTRIAL MOTOR DELAY OFF AND TROUBLE SHOOTING.
19.DUEL/SEQUENTIAL TIMER APPLICATION AND INTERNAL WIRING IDENTIFICATION WITH TIME SETTING PROCEDURE.
20.INDUSTRIAL MOTOR REVERSE /FORWARD CONNECTION PRACTICAL PRACTICE.
21.LOAD SELECTION, ITEM SELECTION AS PER MOTOR CAPACITY AND PRACTICALLY PRACTICE STAR-DELTA CONNECTION WITH 3 PHASE MOTOR.
PLC PROGRAMMING, CONNECTION & TROUBLESHOOTING (SINGLE BRANDS: MITSUBISHI)
1. INTRODUCTION TO PLC.
2. DISCUSS ABOUT PLC INPUT ELEMENT
3. DISCUSS ABOUT PLC OUTPUT ELEMENT
4. DISCUSS ABOUT PLC INPUT MODULE / OUTPUT MODULE
5. DISCUSS ABOUT PLC ADDRESSING.
6. FAMILIARIZATION WITH VARIOUS PLC LANGUAGES
7. BLOCK DIAGRAM OF PLC.
8. FAMILIARIZATION WITH VARIOUS LADDER SYMBOL
9. CONCEPT AND CONVERSION FROM ELECTRICAL DIAGRAM TO LADDER DIAGRAM
10. BASIC CONCEPT OF PLC SOFTWARE & DATA CABLE
11. OVERVIEW AND INSTALLATION OF VARIOUS PLC SOFTWARES
12. LOAD CONTROLLING WITHOUT LATCHING PRACTICAL PRACTICE
13. LOAD CONTROLLING WITH LATCHING PRACTICAL PRACTICE
14. FAMILIARIZATION WITH DIFFERENT TYPE OF INTERNAL TIMERS IN PLC.
15. ON DELAY TIMER LOGIC PRACTICAL PRACTICE
16. DESIGN OF A COMPLICATED PROJECT USING MULTIPLE TIMERS AS PER REQUIREMENT.
17. DESIGN A TRAFFIC SIGNAL PROJECT USING MULTIPLE TIMERS.
18. FAMILIARIZATION WITH VARIOUS TYPE OF COUNTERS IN PLC.
19. LOAD CONTROLLING PRACTICAL PRACTICE USING COUNTERS
20. STAR-DELTA CIRCUIT PRACTICAL PRACTICE IN PLC.
VFD/ FREQUENCY INVERTER PROGRAMMING, CONNECTION, MOTOR RUN, TROUBLESHOOTING (SINGLE BRANDS: MITSUBISHI)
2. VFD HARDWIRE SELECTION PROCEDURE ACCORDING TO LOAD/MOTOR.
3. CONNECTION PROCEDURE OF A MOTOR TO A VFD DEVICE.
4. FAMILIARIZATION WITH VFD INTERNAL AND EXTERNAL MODE
5. VFD EXTERNAL MODE WIRING ACCORDING TO VFD COMPANY MANUAL PRACTICAL PRACTICE
6. FAMILIARIZATION WITH VFD OPERATION MODE SELECTION FOLLOWING VFD MANUAL.
7. INTRODUCTION TO VFD PARAMETER SETTING ACCORDING TO VFD MANUAL.
8. FAMILIARIAZATION WITH VFD FAULT FINDING AND TROUBLE SHOOTING.