DIPLOMA INDUSTRIAL ATTACHMENT COURSE CURRICULUM
COMFORTABLE BATCH
BDT 5000
CLASS 2 DAYS PER WEEK
CLASS DURATION: 2 HOURS
DOMESTIC AND INDUSTRIAL AUTOMATION
1.MULTISTORIED BUILDING WIRING ELECTRICAL EQUIPMENT NAME, AND DESIGN DISPLAYING FROM PROJECTOR.
2.NATIONAL BUILDING CODE RULES AND BUILDING WIRING PRACTICE WITH USING CHANGE OVER AND PROTECTIVE CIRCUIT BREAKER.
3.INTRODUCTION TO INDUSTRIAL SWITCHES: PUSH BUTTON, SELECTOR, ROTARY, TOGGLE AUTO& MANUAL AND DISPLAYING FROM PROJECTOR.
4.OPERATING AND CONNECTION PROCEDURE OF SWITCHES DISPLAY FROM PROJECTOR.
5.DISPLAYING FIRE ALARM EQUIPMENT FROM PROJECTOR AND PRACTICAL PRACTICE.
6.INDUSTRIAL MOTOR CONTROL MAGNETIC CONTACTOR TYPE, CAPACITY SELECTION, AND INTERNAL WIRING DIAGRAM DISPLAYING FROM PROJECTOR.
7.DIAGRAM PREPARATION AND 3 PHASE LOAD RUN PRACTICE FROM NO/NC PUSH AND MAGNETIC CONTACTOR.
8.DESIGNING, DRAWING, CONNECTION AND PROTECTION LOAD TEST PERFORMANCE PRACTICE FROM PROJECTOR.
9.ON DELAY TIMING RELAY INTRODUCTION, VOLTAGE SELECTION, TIMING SELECTION AND INTERNAL WIRING REALIZATION FOR MOTOR STAR DELTA RUN.
10.INDUSTRIAL MOTOR DELAY CONTROL CIRCUIT PRACTICAL PRACTICE BY ON DELAY TIMER.
11.INDUSTRIAL MAGNETIC RELAY TYPE, VOLTAGE AND AMPERE SELECTION. INTERNAL WIRING IDENTIFICATION, SELECTION AS PER LOAD.
12.MONITORING VARIOUS TYPE OF RELAY FROM PROJECTOR AND LOAD CONTROLLING CIRCUIT PRACTICAL PRACTICE.
13.BENEFIT OF APPLICATION DELAY OFF TIMING RELAY ON GENERATOR AND FURNACE BOILER IN INDUSTRY.
14.PRACTICAL PRACTICE OF INDUSTRIAL MOTOR DELAY OFF AND TROUBLE SHOOTING.
15.DUEL/SEQUENTIAL TIMER APPLICATION AND INTERNAL WIRING IDENTIFICATION WITH TIME SETTING PROCEDURE.
16.AUTO CONTROL TRAFFIC SIGNAL PRACTICAL PRACTICE BY SEQUENTIAL TIMER
17.DOMESTIC WATER TANK AUTO CONTROL BY ELECTRICAL FLOAT SENSOR PRACTICAL PRACTICE AND ECONOMY CONNECTION PROCEDURE.
18.AUTO TRANSFER SWITCH (ATS) BENEFIT, CONTROLLING PROCEDURE AND PRACTICAL PRACTICE FOR GENERATOR & REB.
19.HUNTING PREVENTION AUTO TRANSFER SWITCH (ATS) CONTROLLING PROCEDURE AND PRACTICE BY APPLICATION WITH TIMER.
20.INDUSTRIAL MOTOR REVERSE /FORWARD CONNECTION PRACTICAL PRACTICE.
21.LOAD SELECTION, ITEM SELECTION AS PER MOTOR CAPACITY AND PRACTICE STAR-DELTA CONNECTION WITH 3 PHASE MOTOR.
VFD/ FREQUENCY INVERTER PROGRAMMING, CONNECTION, MOTOR RUN, TROUBLESHOOTING (1 BRANDS: MITSUBISHI)
2. VFD HARDWIRE SELECTION PROCEDURE ACCORDING TO LOAD/MOTOR.
3. CONNECTION PROCEDURE OF A MOTOR TO A VFD DEVICE.
4. FAMILIARIZATION WITH VFD INTERNAL AND EXTERNAL MODE
5. VFD EXTERNAL MODE WIRING ACCORDING TO VFD COMPANY MANUAL PRACTICAL PRACTICE
6. FAMILIARIZATION WITH VFD OPERATION MODE SELECTION FOLLOWING VFD MANUAL.
7. INTRODUCTION TO VFD PARAMETER SETTING ACCORDING TO VFD MANUAL.
8. FAMILIARIAZATION WITH VFD FAULT FINDING AND TROUBLE SHOOTING.
PLC PROGRAMMING, CONNECTION & TROUBLESHOOTING (1 BRANDS: MITSUBISHI)
2. DISCUSS ABOUT PLC INPUT ELEMENT
3. DISCUSS ABOUT PLC OUTPUT ELEMENT
4. DISCUSS ABOUT PLC INPUT MODULE / OUTPUT MODULE
5. DISCUSS ABOUT PLC ADDRESSING.
6. FAMILIARIZATION WITH VARIOUS PLC LANGUAGES
7. BLOCK DIAGRAM OF PLC.
8. FAMILIARIZATION WITH VARIOUS LADDER SYMBOL
9. CONCEPT AND CONVERSION FROM ELECTRICAL DIAGRAM TO LADDER DIAGRAM
10. BASIC CONCEPT OF PLC SOFTWARE & DATA CABLE
11. OVERVIEW AND INSTALLATION OF VARIOUS PLC SOFTWARES
12. LOAD CONTROLLING WITHOUT LATCHING PRACTICAL PRACTICE
13. LOAD CONTROLLING WITH LATCHING PRACTICAL PRACTICE
14. FAMILIARIZATION WITH INTERNAL AUXILIARY RELAY IN PLC
15. COMPARISON BETWEEN GENERAL AUXILIARY RELAY AND BATTERY BACKED AUXILIARY RELAY
16. FAMILIARIZATION WITH DIFFERENT TYPE OF INTERNAL TIMERS IN PLC.
17. COUNTING SYSTEM AND LOGIC OF INTERNAL ON DELAY TIMERS IN PLC.
18. DIFFERENCE BETWEEN NORMAL TIMERS AND RETENTIVE TIMERS.
19. ON DELAY TIMER LOGIC PRACTICAL PRACTICE
20. DESIGN OF A COMPLICATED PROJECT USING MULTIPLE TIMERS AS PER REQUIREMENT.
21. DESIGN A TRAFFIC SIGNAL PROJECT USING MULTIPLE TIMERS.
22. FAMILIARIZATION WITH VARIOUS TYPE OF COUNTERS IN PLC.
23. LOAD CONTROLLING PRACTICAL PRACTICE USING COUNTERS
24. STAR-DELTA CIRCUIT PRACTICAL PRACTICE IN PLC.